25/1-2
Exploration, appraisalPlugged and abandonedOil and gas
Drilled by Elf Petroleum Norge AS with Pentagone 81 in Frigg, 22.07.1971 to 25.08.1971 (34 days), to 2 772,0 m in the Shetland Group.
Water depth103,0 m
Total depth2 772,0 m MD
Vertical depth-
Bottom-hole temperature72 °C
Max inclination6,0°
Rotary table24,0 m
Formation at total depthShetland Group
RigPentagone 81
Spud22.07.1971
Completed25.08.1971
OperatorElf Petroleum Norge AS
Position59,9356 N, 2,0818 E
Formations
11 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 72 °C |
| Frigg gradient | 23,0 °C/km |
| Estimated at total depth from the gradient | 65 °C |
The gradient is the median of 7 released wells in Frigg with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 167,0 | 36" | 167,0 | - |
| Surface casing | 13 3/8" | 452,0 | 17 1/2" | 460,0 | - |
| Intermediate | 9 5/8" | 1 850,0 | 12 1/4" | 1 856,0 | - |