25/11-11
Exploration, appraisalPlugged and abandonedOil
Drilled by Esso Exploration and Production Norway A/S with Glomar Biscay Ii in Balder, 18.02.1981 to 18.03.1981 (28 days), to 1 960,0 m in the Ekofisk Formation.
Water depth126,0 m
Total depth1 960,0 m MD
Vertical depth1 960,0 m TVD
Bottom-hole temperature55 °C
Max inclination4,0°
Rotary table25,0 m
Formation at total depthEkofisk Formation
RigGlomar Biscay Ii
Spud18.02.1981
Completed18.03.1981
OperatorEsso Exploration and Production Norway A/S
Position59,1964 N, 2,3465 E
Formations
19 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 55 °C |
| Balder gradient | 33,9 °C/km |
| Estimated at total depth from the gradient | 65 °C |
The gradient is the median of 29 released wells in Balder with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/11-U-31 | 0,4 | 130,2 | - | - | 1999 |
| 25/11-U-27 | 0,8 | 128,1 | - | - | 1999 |
| 25/11-U-28 | 0,8 | 129,0 | - | - | 1999 |
| 25/11-U-29 | 0,8 | 128,9 | - | - | 1999 |
| 25/11-A-23 H | 0,9 | 3 492,0 | - | - | 2013 |
| 25/11-A-21 AH | 0,9 | 2 764,0 | - | - | 2013 |
| 25/11-A-21 H | 0,9 | 2 449,0 | - | - | 2013 |
| 25/11-A-19 AH | 0,9 | 3 791,0 | - | - | 2001 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 214,0 | 36" | 214,0 | - |
| Intermediate | 13 3/8" | 507,8 | 17 1/2" | 523,0 | 1,75 LOT |
| Intermediate | 9 5/8" | 1 302,0 | 12 1/4" | 1 317,0 | 1,81 LOT |
| Open hole | - | 1 972,0 | 8 1/2" | 1 972,0 | - |
Mud weight
4 measurements, one dot each, 1,00 to 1,15 g/cm³ against measured depth, waterbased.