25/11-16
Exploration, wildcatPlugged and abandonedOil
Drilled by Norsk Hydro Produksjon AS with Vildkat Explorer in Svalin, 29.06.1992 to 24.07.1992 (25 days), to 1 945,0 m in the Hod Formation.
Water depth120,0 m
Total depth1 945,0 m MD
Vertical depth1 945,0 m TVD
Bottom-hole temperature71 °C
Max inclination1,4°
Rotary table25,0 m
Formation at total depthHod Formation
RigVildkat Explorer
Spud29.06.1992
Completed24.07.1992
OperatorNorsk Hydro Produksjon AS
Position59,1185 N, 2,3851 E
Formations
18 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 71 °C |
2 released wells in Svalin report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/11-30 A | 0,6 | - | - | - | - |
| 25/11-30 S | 0,6 | 2 606,0 | - | - | 2025 |
| 25/11-24 | 3,0 | 2 117,0 | 81 °C | 1,35 | 2007 |
| 25/11-U-46 | 3,0 | 180,0 | - | - | 2011 |
| 25/11-H-4 AH | 3,0 | 2 393,0 | - | - | 2014 |
| 25/11-H-4 BH | 3,0 | 3 825,0 | - | - | 2014 |
| 25/11-H-4 H | 3,0 | 2 344,0 | - | - | 2014 |
| 25/11-H-3 AH | 3,1 | 4 460,0 | - | - | 2014 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 232,0 | 36" | 233,0 | - |
| Intermediate | 9 5/8" | 1 333,0 | 12 1/4" | 1 335,0 | 1,70 LOT |
| Liner | 7" | 1 764,0 | 8 1/2" | 1 945,0 | - |
Mud weight
11 measurements, one dot each, 1,00 to 1,28 g/cm³ against measured depth, water based.