25/11-4
Exploration, appraisalPlugged and abandonedShows
Drilled by Esso Exploration and Production Norway A/S with Glomar Grand Isle in Balder, 15.10.1970 to 20.11.1970 (36 days), to 1 896,0 m in the Ekofisk Formation.
Water depth127,0 m
Total depth1 896,0 m MD
Vertical depth-
Bottom-hole temperature71 °C
Max inclination-
Rotary table10,0 m
Formation at total depthEkofisk Formation
RigGlomar Grand Isle
Spud15.10.1970
Completed20.11.1970
OperatorEsso Exploration and Production Norway A/S
Position59,1604 N, 2,3907 E
Formations
16 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 71 °C |
| Balder gradient | 33,9 °C/km |
| Estimated at total depth from the gradient | 64 °C |
The gradient is the median of 29 released wells in Balder with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/11-9 | 1,4 | 1 910,0 | 57 °C | 1,11 | 1980 |
| 25/11-25 A | 1,5 | 2 448,0 | 83 °C | 1,45 | 2008 |
| 25/11-25 S | 1,5 | 2 142,0 | 77 °C | 1,47 | 2008 |
| 25/11-U-3 | 1,8 | 157,5 | - | - | 1978 |
| 25/11-U-4 | 1,8 | 158,5 | - | - | 1978 |
| 25/11-BT-3 H | 1,9 | 4 550,0 | - | - | 2025 |
| 25/11-BT-3 Y2H | 1,9 | 4 374,0 | - | - | 2025 |
| 25/11-BT-2 AH | 1,9 | 3 075,0 | - | - | 2023 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 179,0 | 36" | 180,0 | - |
| Surface casing | 20" | 384,0 | 26" | 406,0 | - |
| Intermediate | 9 5/8" | 948,0 | 12 1/4" | 963,0 | - |
| Open hole | - | 1 896,0 | 8 1/2" | 1 896,0 | - |