25/11-9
Exploration, appraisalPlugged and abandonedOil and gas
Drilled by Esso Exploration and Production Norway A/S with Norskald in Balder, 04.11.1980 to 07.12.1980 (33 days), to 1 910,0 m in the Tor Formation.
Water depth126,0 m
Total depth1 910,0 m MD
Vertical depth1 910,0 m TVD
Bottom-hole temperature57 °C
Max inclination-
Rotary table25,0 m
Formation at total depthTor Formation
RigNorskald
Spud04.11.1980
Completed07.12.1980
OperatorEsso Exploration and Production Norway A/S
Position59,1706 N, 2,3752 E
Formations
28 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 57 °C |
| Balder gradient | 33,9 °C/km |
| Estimated at total depth from the gradient | 64 °C |
The gradient is the median of 29 released wells in Balder with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/11-BT-3 H | 0,6 | 4 550,0 | - | - | 2025 |
| 25/11-BT-3 Y2H | 0,6 | 4 374,0 | - | - | 2025 |
| 25/11-BT-4 AY1H | 0,6 | 3 270,0 | - | - | 2025 |
| 25/11-BT-4 AY2H | 0,6 | 3 414,0 | - | - | 2025 |
| 25/11-BT-4 H | 0,6 | 2 778,0 | - | - | 2025 |
| 25/11-BT-2 AH | 0,6 | 3 075,0 | - | - | 2023 |
| 25/11-BT-2 H | 0,6 | 2 361,0 | - | - | 2023 |
| 25/11-BT-1 H | 0,6 | 4 200,0 | - | - | 2023 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 213,5 | - | - | - |
| Intermediate | 13 3/8" | 482,3 | - | - | - |
| Intermediate | 9 5/8" | 1 207,5 | - | - | - |
| Open hole | - | 1 910,0 | 8 1/2" | 1 910,0 | - |
Mud weight
6 measurements, one dot each, 1,00 to 1,11 g/cm³ against measured depth, waterbased.