Fields / Balder / 25/11-BT-1 H
25/11-BT-1 H
Development, productionProducingOil
Drilled by Vår Energi ASA with West Phoenix in Balder, 27.12.2023 to 14.06.2024 (170 days), to 4 200,0 m.
Water depth125,8 m
Total depth4 200,0 m MD
Vertical depth1 791,1 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table38,6 m
Formation at total depth-
RigWest Phoenix
Spud27.12.2023
Completed14.06.2024
OperatorVår Energi ASA
Position59,1760 N, 2,3772 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Balder gradient | 33,9 °C/km |
| Estimated at total depth from the gradient | 59 °C |
The gradient is the median of 29 released wells in Balder with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/11-BT-4 AY1H | 0,0 | 3 270,0 | - | - | 2025 |
| 25/11-BT-4 AY2H | 0,0 | 3 414,0 | - | - | 2025 |
| 25/11-BT-4 H | 0,0 | 2 778,0 | - | - | 2025 |
| 25/11-BT-2 AH | 0,0 | 3 075,0 | - | - | 2023 |
| 25/11-BT-2 H | 0,0 | 2 361,0 | - | - | 2023 |
| 25/11-BT-3 H | 0,0 | 4 550,0 | - | - | 2025 |
| 25/11-BT-3 Y2H | 0,0 | 4 374,0 | - | - | 2025 |
| 25/11-B-18 H | 0,2 | 3 020,0 | - | - | 2001 |
Casing and formation tests
No casing programme is reported for this wellbore.