25/11-6
Exploration, appraisalPlugged and abandonedOil
Drilled by Esso Exploration and Production Norway A/S with Norskald in Balder, 20.08.1978 to 01.10.1978 (42 days), to 1 948,0 m in the Cromer Knoll Group.
Formations
24 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 65 °C |
| Balder gradient | 33,9 °C/km |
| Estimated at total depth from the gradient | 65 °C |
The gradient is the median of 29 released wells in Balder with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/11-1 | 0,7 | 2 459,0 | 71 °C | - | 1966 |
| 25/11-U-3 | 0,8 | 157,5 | - | - | 1978 |
| 25/11-U-4 | 0,8 | 158,5 | - | - | 1978 |
| 25/11-C-3 AH | 0,8 | 2 273,0 | - | - | 1997 |
| 25/11-C-3 BH | 0,8 | 2 118,0 | - | - | 1997 |
| 25/11-C-3 CH | 0,8 | 3 024,0 | - | - | 2000 |
| 25/11-C-3 DH | 0,8 | 2 735,0 | - | - | 2001 |
| 25/11-C-3 EH | 0,8 | 3 187,0 | - | - | 2001 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 187,0 | 36" | 187,0 | - |
| Intermediate | 13 3/8" | 394,0 | 17 1/2" | 410,0 | - |
| Intermediate | 9 5/8" | 1 310,0 | 12 1/4" | 1 327,0 | - |
| Liner | 7" | 1 927,0 | 8 1/2" | 1 948,0 | - |
Mud weight
3 measurements, one dot each, 1,10 to 1,14 g/cm³ against measured depth, waterbased.
Drill-stem tests
Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
| Test | Interval, m | Choke | Pressure | Temp. | Oil | Gas |
|---|---|---|---|---|---|---|
| 1 | 1 725,0 - 1 740,0 | 13,9 | - | - | 485 | 1 800 000 |