25/11-7
Exploration, appraisalPlugged and abandonedOil
Drilled by Esso Exploration and Production Norway A/S with Norskald in Balder, 03.10.1978 to 27.10.1978 (24 days), to 1 944,0 m in the Tor Formation.
Formations
25 tops reported, measured depth in metres.
Temperature
| Reported at total depth | - |
| Balder gradient | 33,9 °C/km |
| Estimated at total depth from the gradient | 65 °C |
The gradient is the median of 29 released wells in Balder with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/11-BT-4 AY1H | 0,8 | 3 270,0 | - | - | 2025 |
| 25/11-BT-4 AY2H | 0,8 | 3 414,0 | - | - | 2025 |
| 25/11-BT-4 H | 0,8 | 2 778,0 | - | - | 2025 |
| 25/11-BT-1 H | 0,8 | 4 200,0 | - | - | 2023 |
| 25/11-BT-3 H | 0,8 | 4 550,0 | - | - | 2025 |
| 25/11-BT-3 Y2H | 0,8 | 4 374,0 | - | - | 2025 |
| 25/11-BT-2 AH | 0,8 | 3 075,0 | - | - | 2023 |
| 25/11-BT-2 H | 0,8 | 2 361,0 | - | - | 2023 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 186,0 | 36" | 186,0 | - |
| Intermediate | 13 3/8" | 396,0 | 17 1/2" | 412,0 | - |
| Intermediate | 9 5/8" | 1 308,0 | 12 1/4" | 1 325,0 | - |
| Open hole | - | 1 944,0 | 8 1/2" | 1 944,0 | - |
Mud weight
4 measurements, one dot each, 1,00 to 1,13 g/cm³ against measured depth, waterbased.