WellplannerNorwegian shelf well data

Fields / Balder / 25/11-A-5 AH

25/11-A-5 AH

Development, observationPlugged

Drilled by Esso Exploration and Production Norway A/S with West Alpha in Balder, 04.11.1996 to 20.08.1997 (289 days), to 3 068,0 m.

Water depth124,0 m
Total depth3 068,0 m MD
Vertical depth1 797,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table18,0 m
Formation at total depth-
RigWest Alpha
Spud04.11.1996
Completed20.08.1997
OperatorEsso Exploration and Production Norway A/S
Position59,1917 N, 2,3595 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Balder gradient33,9 °C/km
Estimated at total depth from the gradient60 °C

The gradient is the median of 29 released wells in Balder with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
25/11-A-5 BH same well0,02 988,0--1997
25/11-A-5 H same well0,02 502,0--1996
25/11-A-8 H0,0909,0--1996
25/11-A-19 AH0,03 791,0--2001
25/11-A-19 H0,03 660,0--2001
25/11-A-4 AH0,12 122,0--1996
25/11-A-4 BH0,12 923,0--2001
25/11-A-4 CH0,13 700,0--2001

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗