25/11-A-8 H
Development, productionPluggedWater
Drilled by Esso Exploration and Production Norway A/S with West Alpha in Balder, 11.12.1996 to 23.09.1997 (286 days), to 909,0 m.
Water depth126,0 m
Total depth909,0 m MD
Vertical depth909,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table18,0 m
Formation at total depth-
RigWest Alpha
Spud11.12.1996
Completed23.09.1997
OperatorEsso Exploration and Production Norway A/S
Position59,1916 N, 2,3591 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Balder gradient | 33,9 °C/km |
| Estimated at total depth from the gradient | 30 °C |
The gradient is the median of 29 released wells in Balder with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/11-A-19 AH | 0,0 | 3 791,0 | - | - | 2001 |
| 25/11-A-19 H | 0,0 | 3 660,0 | - | - | 2001 |
| 25/11-A-5 AH | 0,0 | 3 068,0 | - | - | 1996 |
| 25/11-A-5 BH | 0,0 | 2 988,0 | - | - | 1997 |
| 25/11-A-5 H | 0,0 | 2 502,0 | - | - | 1996 |
| 25/11-A-21 AH | 0,1 | 2 764,0 | - | - | 2013 |
| 25/11-A-21 H | 0,1 | 2 449,0 | - | - | 2013 |
| 25/11-A-4 AH | 0,1 | 2 122,0 | - | - | 1996 |
Casing and formation tests
No casing programme is reported for this wellbore.