25/11-G-32 A
Development, injectionInjectingWater
Drilled by Equinor Energy AS with Grane in Grane, 22.07.2024 to 26.08.2024 (35 days), to 3 680,0 m.
Water depth127,5 m
Total depth3 680,0 m MD
Vertical depth1 848,3 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table69,9 m
Formation at total depth-
RigGrane
Spud22.07.2024
Completed26.08.2024
OperatorEquinor Energy AS
Position59,1652 N, 2,4875 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Grane gradient | 42,7 °C/km |
| Estimated at total depth from the gradient | 74 °C |
The gradient is the median of 4 released wells in Grane with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/11-G-32 same well | 0,0 | 3 489,0 | - | - | 2010 |
| 25/11-G-41 | 0,0 | 2 392,0 | - | - | 2010 |
| 25/11-G-28 | 0,0 | 4 930,0 | - | - | 2002 |
| 25/11-G-36 | 0,0 | 2 005,0 | - | - | 2012 |
| 25/11-G-31 | 0,0 | 3 982,0 | - | - | 2007 |
| 25/11-G-31 A | 0,0 | - | - | - | - |
| 25/11-G-31 AY1 | 0,0 | 4 081,0 | - | - | 2015 |
| 25/11-G-31 AY2 | 0,0 | - | - | - | - |
Casing and formation tests
No casing programme is reported for this wellbore.