25/11-G-28
Development, productionProducingOil
Drilled by Norsk Hydro Produksjon AS with Scarabeo 6 in Grane, 20.08.2002 to 22.10.2002 (63 days), to 4 930,0 m.
Water depth127,5 m
Total depth4 930,0 m MD
Vertical depth1 835,6 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table26,0 m
Formation at total depth-
RigScarabeo 6
Spud20.08.2002
Completed22.10.2002
OperatorNorsk Hydro Produksjon AS
Position59,1652 N, 2,4875 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Grane gradient | 42,7 °C/km |
| Estimated at total depth from the gradient | 76 °C |
The gradient is the median of 4 released wells in Grane with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/11-G-32 | 0,0 | 3 489,0 | - | - | 2010 |
| 25/11-G-32 A | 0,0 | 3 680,0 | - | - | 2024 |
| 25/11-G-41 | 0,0 | 2 392,0 | - | - | 2010 |
| 25/11-G-24 | 0,0 | 2 105,0 | - | - | 2001 |
| 25/11-G-24 A | 0,0 | 2 944,0 | - | - | 2001 |
| 25/11-G-27 | 0,0 | 2 090,0 | - | - | 2001 |
| 25/11-G-27 A | 0,0 | 3 800,0 | - | - | 2002 |
| 25/11-G-31 | 0,0 | 3 982,0 | - | - | 2007 |
Casing and formation tests
No casing programme is reported for this wellbore.