WellplannerNorwegian shelf well data

Fields / Grane / 25/11-G-24

25/11-G-24

Development, observationPlugged

Drilled by Norsk Hydro Produksjon AS with Scarabeo 6 in Grane, 13.09.2001 to 15.10.2001 (32 days), to 2 105,0 m.

Water depth127,5 m
Total depth2 105,0 m MD
Vertical depth1 862,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table26,0 m
Formation at total depth-
RigScarabeo 6
Spud13.09.2001
Completed15.10.2001
OperatorNorsk Hydro Produksjon AS
Position59,1653 N, 2,4874 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Grane gradient42,7 °C/km
Estimated at total depth from the gradient77 °C

The gradient is the median of 4 released wells in Grane with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
25/11-G-24 A same well0,02 944,0--2001
25/11-G-280,04 930,0--2002
25/11-G-200,02 266,0--2002
25/11-G-20 A0,03 400,0--2002
25/11-G-20 B0,02 815,0--2026
25/11-G-230,01 620,0--2002
25/11-G-23 A0,01 638,0--2011
25/11-G-270,02 090,0--2001

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗