Fields / Balder / 25/11-GT-2 H
25/11-GT-2 H
Development, productionProducingOil
Drilled by Vår Energi AS with West Phoenix in Balder, 16.09.2021 to 08.05.2022 (234 days), to 3 285,0 m.
Water depth128,3 m
Total depth3 285,0 m MD
Vertical depth1 773,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table38,6 m
Formation at total depth-
RigWest Phoenix
Spud16.09.2021
Completed08.05.2022
OperatorVår Energi AS
Position59,2391 N, 2,4487 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Balder gradient | 33,9 °C/km |
| Estimated at total depth from the gradient | 59 °C |
The gradient is the median of 29 released wells in Balder with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/11-GT-3 H | 0,0 | 3 534,0 | - | - | 2021 |
| 25/11-GT-1 Y1H | 0,0 | - | - | - | - |
| 25/11-GT-1 Y2H | 0,0 | - | - | - | - |
| 25/11-GT-4 H | 0,0 | 5 782,0 | - | - | 2021 |
| 25/11-U-33 | 0,7 | 132,3 | - | - | 1999 |
| 25/11-U-32 | 0,7 | 132,4 | - | - | 1999 |
| 25/11-U-17 | 1,2 | 130,7 | - | - | 1999 |
| 25/11-U-16 | 1,2 | 130,7 | - | - | 1999 |
Casing and formation tests
No casing programme is reported for this wellbore.