WellplannerNorwegian shelf well data

Fields / Balder / 25/11-GT-4 H

25/11-GT-4 H

Development, productionProducingOil

Drilled by Vår Energi AS with West Phoenix in Balder, 29.09.2021 to 19.07.2023 (658 days), to 5 782,0 m.

Water depth128,3 m
Total depth5 782,0 m MD
Vertical depth1 787,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table38,6 m
Formation at total depth-
RigWest Phoenix
Spud29.09.2021
Completed19.07.2023
OperatorVår Energi AS
Position59,2391 N, 2,4489 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Balder gradient33,9 °C/km
Estimated at total depth from the gradient59 °C

The gradient is the median of 29 released wells in Balder with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
25/11-GT-1 Y1H0,0----
25/11-GT-1 Y2H0,0----
25/11-GT-3 H0,03 534,0--2021
25/11-GT-2 H0,03 285,0--2021
25/11-U-330,7132,3--1999
25/11-U-320,7132,4--1999
25/11-U-171,2130,7--1999
25/11-U-161,2130,7--1999

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗