Fields / Balder / 25/11-HT-1 H
25/11-HT-1 H
Development, productionProducingOil
Drilled by Vår Energi ASA with West Phoenix in Balder, 21.01.2024 to 31.03.2024 (70 days), to 3 739,0 m.
Water depth128,8 m
Total depth3 739,0 m MD
Vertical depth1 769,3 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table38,6 m
Formation at total depth-
RigWest Phoenix
Spud21.01.2024
Completed31.03.2024
OperatorVår Energi ASA
Position59,2470 N, 2,4647 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Balder gradient | 33,9 °C/km |
| Estimated at total depth from the gradient | 58 °C |
The gradient is the median of 29 released wells in Balder with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/11-HT-4 H | 0,0 | 4 500,0 | - | - | 2025 |
| 25/11-HT-4 Y2H | 0,0 | 4 544,0 | - | - | 2026 |
| 25/11-HT-2 Y1H | 0,0 | 4 907,0 | - | - | 2024 |
| 25/11-HT-2 Y2H | 0,0 | 4 723,0 | - | - | 2024 |
| 25/11-HT-3 Y1H | 0,0 | 4 860,0 | - | - | 2025 |
| 25/11-HT-3 Y2H | 0,0 | 4 670,0 | - | - | 2026 |
| 25/11-GT-4 H | 1,3 | 5 782,0 | - | - | 2021 |
| 25/11-GT-3 H | 1,3 | 3 534,0 | - | - | 2021 |
Casing and formation tests
No casing programme is reported for this wellbore.