Fields / Breidablikk / 25/11-J-1 H
25/11-J-1 H
Development, observationPlugged
Drilled by Equinor Energy AS with Deepsea Aberdeen in Breidablikk, 28.10.2022 to 27.11.2022 (30 days), to 3 192,0 m.
Water depth126,0 m
Total depth3 192,0 m MD
Vertical depth1 778,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table30,0 m
Formation at total depth-
RigDeepsea Aberdeen
Spud28.10.2022
Completed27.11.2022
OperatorEquinor Energy AS
Position59,2311 N, 2,5563 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Breidablikk gradient | 40,4 °C/km |
| Estimated at total depth from the gradient | 70 °C |
The gradient is the median of 3 released wells in Breidablikk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/11-J-1 AH same well | 0,0 | 3 957,0 | - | - | 2022 |
| 25/11-J-1 BY1H same well | 0,0 | 3 770,0 | - | - | 2023 |
| 25/11-J-1 BY2H same well | 0,0 | 4 100,0 | - | - | 2023 |
| 25/11-J-2 AH | 0,0 | 3 892,0 | - | - | 2025 |
| 25/11-J-2 BY1H | 0,0 | 4 200,0 | - | - | 2025 |
| 25/11-J-2 BY2H | 0,0 | - | - | - | - |
| 25/11-J-2 H | 0,0 | 4 201,0 | - | - | 2025 |
| 25/11-J-3 AY1H | 0,0 | - | - | - | 2025 |
Casing and formation tests
No casing programme is reported for this wellbore.