WellplannerNorwegian shelf well data

Fields / Breidablikk / 25/11-J-2 H

25/11-J-2 H

Development, observationPlugged

Drilled by Equinor Energy AS with Deepsea Aberdeen in Breidablikk, 12.04.2025 to 28.04.2025 (16 days), to 4 201,0 m.

Water depth127,0 m
Total depth4 201,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table30,0 m
Formation at total depth-
RigDeepsea Aberdeen
Spud12.04.2025
Completed28.04.2025
OperatorEquinor Energy AS
Position59,2311 N, 2,5562 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Breidablikk gradient40,4 °C/km
Estimated at total depth from the gradient167 °C

The gradient is the median of 3 released wells in Breidablikk with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
25/11-J-2 AH same well0,03 892,0--2025
25/11-J-2 BY1H same well0,04 200,0--2025
25/11-J-2 BY2H same well0,0----
25/11-J-3 AY1H0,0---2025
25/11-J-3 AY2H0,04 129,0--2025
25/11-J-3 H0,04 315,0--2025
25/11-J-1 AH0,03 957,0--2022
25/11-J-1 BY1H0,03 770,0--2023

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗