WellplannerNorwegian shelf well data

Fields / Breidablikk / 25/11-J-3 H

25/11-J-3 H

Development, observationClosed

Drilled by Equinor Energy AS with Deepsea Aberdeen in Breidablikk, 22.01.2025 to 02.03.2025 (39 days), to 4 315,0 m.

Water depth127,0 m
Total depth4 315,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table30,0 m
Formation at total depth-
RigDeepsea Aberdeen
Spud22.01.2025
Completed02.03.2025
OperatorEquinor Energy AS
Position59,2312 N, 2,5562 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Breidablikk gradient40,4 °C/km
Estimated at total depth from the gradient172 °C

The gradient is the median of 3 released wells in Breidablikk with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
25/11-J-3 AY1H same well0,0---2025
25/11-J-3 AY2H same well0,04 129,0--2025
25/11-J-2 AH0,03 892,0--2025
25/11-J-2 BY1H0,04 200,0--2025
25/11-J-2 BY2H0,0----
25/11-J-2 H0,04 201,0--2025
25/11-J-1 AH0,03 957,0--2022
25/11-J-1 BY1H0,03 770,0--2023

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗