Fields / 25/11-U-38
25/11-U-38
Other, unknownPlugged and abandoned
Drilled by Esso Exploration and Production Norway A/S with Fugro I, 19.08.1999 to 04.09.1999 (16 days), to 131,8 m.
Water depth128,9 m
Total depth131,8 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table-
Formation at total depth-
RigFugro I
Spud19.08.1999
Completed04.09.1999
OperatorEsso Exploration and Production Norway A/S
Position59,2069 N, 2,4201 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/11-U-39 | 0,0 | 131,8 | - | - | 1999 |
| 25/11-U-37 | 0,8 | 130,9 | - | - | 1999 |
| 25/11-DT-2 H | 0,9 | 2 769,0 | - | - | 2022 |
| 25/11-DT-3 H | 0,9 | 4 482,0 | - | - | 2023 |
| 25/11-DT-1 Y1H | 0,9 | 3 705,0 | - | - | 2022 |
| 25/11-DT-1 Y2H | 0,9 | 3 989,0 | - | - | 2023 |
| 25/11-DT-4 H | 0,9 | 3 122,0 | - | - | 2022 |
| 25/11-D-21 H | 0,9 | - | - | - | - |
Casing and formation tests
No casing programme is reported for this wellbore.