Fields / Hugin / 25/2-10 S
25/2-10 S
Exploration, wildcatSuspendedOil and gas
Drilled by Elf Petroleum Norge AS with Henry Goodrich in Hugin, 02.12.1985 to 19.03.1986 (107 days), to 2 967,0 m in the Ekofisk Formation.
Water depth120,0 m
Total depth2 967,0 m MD
Vertical depth2 643,0 m TVD
Bottom-hole temperature75 °C
Max inclination-
Rotary table21,0 m
Formation at total depthEkofisk Formation
RigHenry Goodrich
Spud02.12.1985
Completed19.03.1986
OperatorElf Petroleum Norge AS
Position59,8866 N, 2,5023 E
Formations
24 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 75 °C |
| Hugin gradient | 29,6 °C/km |
| Estimated at total depth from the gradient | 78 °C |
The gradient is the median of 6 released wells in Hugin with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 25/2-10 SR same well | 0,0 | 2 971,0 | 75 °C | - | 1987 |
| 25/2-11 | 1,6 | 2 075,0 | 58 °C | 1,18 | 1987 |
| 25/2-22 S | 2,1 | 1 805,0 | - | 1,30 | 2021 |
| 25/2-21 | 2,8 | 1 200,0 | - | 1,21 | 2019 |
| 25/2-20 | 2,8 | 663,0 | - | - | 2019 |
| 25/2-D-6 Y1 | 4,0 | 6 910,0 | - | - | 2025 |
| 25/2-D-6 Y2 | 4,0 | 6 930,0 | - | - | 2026 |
| 25/2-D-6 Y3 | 4,0 | 6 987,0 | - | - | 2026 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 202,0 | 36" | 202,0 | - |
| Intermediate | 20" | 616,0 | 26" | 626,0 | - |
| Intermediate | 13 3/8" | 1 032,0 | 17 1/2" | 1 045,0 | - |
| Intermediate | 9 5/8" | 2 115,0 | 12 1/4" | 2 129,0 | - |
| Liner | 7" | 2 967,0 | 8 1/2" | 2 967,0 | - |
Mud weight
63 measurements, one dot each, 1,00 to 1,26 g/cm³ against measured depth, water based.