WellplannerNorwegian shelf well data

Fields / 25/2-22 S

25/2-22 S

Exploration, appraisalPlugged and abandonedShows

Drilled by Aker BP ASA with Deepsea Nordkapp, 23.03.2021 to 24.08.2021 (154 days), to 1 805,0 m in the Hordaland Group.

Water depth111,0 m
Total depth1 805,0 m MD
Vertical depth1 800,0 m TVD
Bottom-hole temperature-
Max inclination6,2°
Rotary table33,0 m
Formation at total depthHordaland Group
RigDeepsea Nordkapp
Spud23.03.2021
Completed24.08.2021
OperatorAker BP ASA
Position59,8809 N, 2,4668 E

Formations

7 tops reported, measured depth in metres.

GroupsNordland Group, top 144,0 mNordland GpHordaland Group, top 608,0 mHordaland GpFormationsUndifferentiated, top 144,0 mUndifferentiatedUtsira Formation, top 285,0 mUtsira FmSkade Formation, top 608,0 mSkade FmUndifferentiated, top 1 068,5 mUndifferentiatedNo Formal Name, top 1 530,0 mNo Formal Name1445001 0001 5001 805

Temperature

Reported at total depth-

The wellbore is not in a field, so no field gradient applies.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
25/2-210,91 200,0-1,212019
25/2-200,9663,0--2019
25/2-10 S2,12 967,075 °C1,261985
25/2-10 SR2,12 971,075 °C-1987
25/2-112,92 075,058 °C1,181987
25/2-U-183,4---2024
25/2-H-4 AY1H3,4----
25/2-H-4 AY2H3,4----

Casing and formation tests

The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.

StringCasingShoe, mHoleHole depth, mTest, g/cm³
Conductor30"205,736"210,2-
Intermediate20"821,626"830,01,40 FIT
Open hole-1 805,08 1/2"1 805,0-

Mud weight

5 measurements, one dot each, 1,00 to 1,30 g/cm³ against measured depth, synthetic, water.

1,01,11,21,305001 0001 500142,0 m: 1,03 g/cm³, Water710,0 m: 1,03 g/cm³, Water827,0 m: 1,30 g/cm³, Water830,0 m: 1,10 g/cm³, Synthetic1 805,0 m: 1,14 g/cm³, Synthetic
Show on the mapOpen on FactPages ↗