25/2-2
Exploration, appraisalPlugged and abandonedOil and gas
Drilled by Elf Petroleum Norge AS with Deepsea Driller in Øst Frigg, 31.05.1974 to 11.07.1974 (41 days), to 2 740,0 m in the Hardråde Formation.
Formations
11 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 71 °C |
| Øst Frigg gradient | 31,3 °C/km |
| Estimated at total depth from the gradient | 86 °C |
The gradient is the median of 8 released wells in Øst Frigg with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/2-U-6 | 1,1 | 147,0 | - | - | 1985 |
| 25/2-U-5 | 1,1 | 148,0 | - | - | 1985 |
| 25/2-B-2 H | 1,4 | 2 470,0 | - | - | 1987 |
| 25/2-B-1 H | 1,4 | 2 140,0 | - | - | 1987 |
| 25/2-U-4 | 1,6 | 147,0 | - | - | 1985 |
| 25/2-U-3 | 1,6 | 141,0 | - | - | 1985 |
| 25/2-9 | 2,0 | 2 297,0 | 57 °C | 1,30 | 1985 |
| 25/2-8 | 2,2 | 2 380,0 | 73 °C | 1,30 | 1984 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 165,0 | 36" | 166,0 | - |
| Surface casing | 13 3/8" | 442,0 | 17 1/2" | 444,0 | - |
| Intermediate | 9 5/8" | 1 912,0 | 12 1/4" | 1 914,0 | - |
| Open hole | - | 2 740,0 | 8 1/2" | 2 740,0 | - |
Mud weight
5 measurements, one dot each, 1,10 to 1,33 g/cm³ against measured depth, water based.
Drill-stem tests
Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
| Test | Interval, m | Choke | Pressure | Temp. | Oil | Gas |
|---|---|---|---|---|---|---|
| 1 | 1 983,0 - 1 996,0 | - | - | - | - | - |