Fields / 25/2-U-6
25/2-U-6
Other, soil drillingPlugged and abandoned
Drilled by Elf Petroleum Norge AS with Bucentaur, 07.09.1985 to 07.09.1985 (0 days), to 147,0 m.
Water depth112,6 m
Total depth147,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table2,9 m
Formation at total depth-
RigBucentaur
Spud07.09.1985
Completed07.09.1985
OperatorElf Petroleum Norge AS
Position59,8909 N, 2,3564 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/2-U-5 | 0,0 | 148,0 | - | - | 1985 |
| 25/2-B-2 H | 0,3 | 2 470,0 | - | - | 1987 |
| 25/2-B-1 H | 0,3 | 2 140,0 | - | - | 1987 |
| 25/2-9 | 1,0 | 2 297,0 | 57 °C | 1,30 | 1985 |
| 25/2-2 | 1,1 | 2 740,0 | 71 °C | 1,33 | 1974 |
| 25/2-U-4 | 1,5 | 147,0 | - | - | 1985 |
| 25/2-U-3 | 1,5 | 141,0 | - | - | 1985 |
| 25/2-U-17 | 1,6 | 1 060,0 | - | - | 2023 |
Casing and formation tests
No casing programme is reported for this wellbore.