25/2-25 B
Development, observationPlugged
Drilled by Aker BP ASA with Scarabeo 8 in Hugin, 19.04.2024 to 29.04.2024 (10 days), to 8 513,0 m.
Water depth120,5 m
Total depth8 513,0 m MD
Vertical depth1 991,2 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table33,6 m
Formation at total depth-
RigScarabeo 8
Spud19.04.2024
Completed29.04.2024
OperatorAker BP ASA
Position59,8619 N, 2,5887 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Hugin gradient | 29,6 °C/km |
| Estimated at total depth from the gradient | 58 °C |
The gradient is the median of 6 released wells in Hugin with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/2-25 A same well | 0,0 | 7 470,0 | - | - | 2024 |
| 25/2-25 AY2 same well | 0,0 | 4 503,0 | - | - | 2024 |
| 25/2-25 BY2 same well | 0,0 | 5 499,0 | - | - | 2024 |
| 25/2-25 S same well | 0,0 | 2 116,0 | - | - | 2024 |
| 25/2-U-13 | 0,0 | 1 103,0 | - | - | 2023 |
| 25/2-D-11 | 1,6 | 7 524,0 | - | - | 2025 |
| 25/2-D-11 AY1 | 1,6 | 7 196,0 | - | - | 2026 |
| 25/2-D-11 AY2 | 1,6 | - | - | - | 2026 |
Casing and formation tests
No casing programme is reported for this wellbore.