Fields / 25/2-U-13
25/2-U-13
Other, shallow gasPlugged
Drilled by Aker BP ASA with Scarabeo 8, 25.11.2023 to 26.11.2023 (1 days), to 1 103,0 m.
Water depth120,2 m
Total depth1 103,0 m MD
Vertical depth1 103,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table33,6 m
Formation at total depth-
RigScarabeo 8
Spud25.11.2023
Completed26.11.2023
OperatorAker BP ASA
Position59,8617 N, 2,5886 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/2-25 A | 0,0 | 7 470,0 | - | - | 2024 |
| 25/2-25 AY2 | 0,0 | 4 503,0 | - | - | 2024 |
| 25/2-25 B | 0,0 | 8 513,0 | - | - | 2024 |
| 25/2-25 BY2 | 0,0 | 5 499,0 | - | - | 2024 |
| 25/2-25 S | 0,0 | 2 116,0 | - | - | 2024 |
| 25/2-D-11 | 1,6 | 7 524,0 | - | - | 2025 |
| 25/2-D-11 AY1 | 1,6 | 7 196,0 | - | - | 2026 |
| 25/2-D-11 AY2 | 1,6 | - | - | - | 2026 |
Casing and formation tests
No casing programme is reported for this wellbore.