WellplannerNorwegian shelf well data

Fields / Hugin / 25/2-D-12

25/2-D-12

Development, injectionClosed

Drilled by Aker BP ASA with Noble Integrator in Hugin, 08.10.2025 to 03.03.2026 (146 days), to 3 025,0 m.

Water depth119,3 m
Total depth3 025,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table58,6 m
Formation at total depth-
RigNoble Integrator
Spud08.10.2025
Completed03.03.2026
OperatorAker BP ASA
Position59,8715 N, 2,5677 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Hugin gradient29,6 °C/km
Estimated at total depth from the gradient88 °C

The gradient is the median of 6 released wells in Hugin with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
25/2-D-4 Y10,05 497,0--2025
25/2-D-4 Y20,05 910,0--2026
25/2-D-4 Y30,05 590,0--2026
25/2-D-4 Y40,06 213,0--2026
25/2-D-130,03 132,0--2025
25/2-D-110,07 524,0--2025
25/2-D-11 AY10,07 196,0--2026
25/2-D-11 AY20,0---2026

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗