25/2-D-4 Y3
Development, productionClosedOil
Drilled by Aker BP ASA with Noble Integrator in Hugin, 10.08.2026 to 14.08.2026 (4 days), to 5 590,0 m.
Water depth119,3 m
Total depth5 590,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table58,7 m
Formation at total depth-
RigNoble Integrator
Spud10.08.2026
Completed14.08.2026
OperatorAker BP ASA
Position59,8715 N, 2,5676 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Hugin gradient | 29,6 °C/km |
| Estimated at total depth from the gradient | 164 °C |
The gradient is the median of 6 released wells in Hugin with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/2-D-4 Y1 same well | 0,0 | 5 497,0 | - | - | 2025 |
| 25/2-D-4 Y2 same well | 0,0 | 5 910,0 | - | - | 2026 |
| 25/2-D-4 Y4 same well | 0,0 | 6 213,0 | - | - | 2026 |
| 25/2-D-12 | 0,0 | 3 025,0 | - | - | 2025 |
| 25/2-D-3 Y1 | 0,0 | 6 940,0 | - | - | 2025 |
| 25/2-D-3 Y2 | 0,0 | 6 804,0 | - | - | 2025 |
| 25/2-D-3 Y3 | 0,0 | 4 438,0 | - | - | 2025 |
| 25/2-D-13 | 0,0 | 3 132,0 | - | - | 2025 |
Casing and formation tests
No casing programme is reported for this wellbore.