25/2-D-14
Development, observationPlugged
Drilled by Aker BP ASA with Noble Integrator in Hugin, 10.10.2025 to 10.06.2026 (243 days).
Water depth119,3 m
Total depth-
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table58,6 m
Formation at total depth-
RigNoble Integrator
Spud10.10.2025
Completed10.06.2026
OperatorAker BP ASA
Position59,8716 N, 2,5676 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Hugin gradient | 29,6 °C/km |
The gradient is the median of 6 released wells in Hugin with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/2-D-14 AY1 same well | 0,0 | - | - | - | 2026 |
| 25/2-D-14 AY2 same well | 0,0 | - | - | - | 2026 |
| 25/2-D-14 AY3 same well | 0,0 | - | - | - | 2026 |
| 25/2-D-6 Y1 | 0,0 | 6 910,0 | - | - | 2025 |
| 25/2-D-6 Y2 | 0,0 | 6 930,0 | - | - | 2026 |
| 25/2-D-6 Y3 | 0,0 | 6 987,0 | - | - | 2026 |
| 25/2-D-13 | 0,0 | 3 132,0 | - | - | 2025 |
| 25/2-D-12 | 0,0 | 3 025,0 | - | - | 2025 |
Casing and formation tests
No casing programme is reported for this wellbore.