Fields / Hugin Satellitter / 25/5-A-6
25/5-A-6
Development, productionPlugged and abandonedDry
Drilled by Elf Petroleum Norge AS with Mærsk Gallant in Hugin Satellitter, 02.11.1994 to 20.12.1994 (48 days), to 3 742,0 m.
Water depth120,0 m
Total depth3 742,0 m MD
Vertical depth3 155,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table45,0 m
Formation at total depth-
RigMærsk Gallant
Spud02.11.1994
Completed20.12.1994
OperatorElf Petroleum Norge AS
Position59,7343 N, 2,5578 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Hugin Satellitter gradient | 33,8 °C/km |
| Estimated at total depth from the gradient | 105 °C |
The gradient is the median of 11 released wells in Hugin Satellitter with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.