Fields / Hugin Satellitter / 25/5-A-8
25/5-A-8
Development, productionPlugged and abandonedOil
Drilled by Elf Petroleum Norge AS with Mærsk Gallant in Hugin Satellitter, 10.10.1995 to 17.11.1995 (38 days), to 4 589,0 m.
Water depth120,0 m
Total depth4 589,0 m MD
Vertical depth3 251,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table45,0 m
Formation at total depth-
RigMærsk Gallant
Spud10.10.1995
Completed17.11.1995
OperatorElf Petroleum Norge AS
Position59,7343 N, 2,5577 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Hugin Satellitter gradient | 33,8 °C/km |
| Estimated at total depth from the gradient | 108 °C |
The gradient is the median of 11 released wells in Hugin Satellitter with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/5-A-2 | 0,0 | 4 084,0 | - | - | 1993 |
| 25/5-A-2 A | 0,0 | 4 590,0 | - | - | 1995 |
| 25/5-A-9 | 0,0 | 3 750,0 | - | - | 1995 |
| 25/5-A-4 | 0,0 | 3 810,0 | - | - | 1993 |
| 25/5-A-5 | 0,0 | 3 410,0 | - | - | 1994 |
| 25/5-A-7 | 0,0 | 4 760,0 | - | - | 1995 |
| 25/5-A-6 | 0,0 | 3 742,0 | - | - | 1994 |
| 25/5-A-6 A | 0,0 | 3 840,0 | - | - | 1994 |
Casing and formation tests
No casing programme is reported for this wellbore.