25/5-C-1 H
Development, observationPlugged
Drilled by Total E&P Norge AS with Scarabeo 6 in Skirne, 11.05.2003 to 28.06.2003 (48 days), to 3 395,0 m.
Water depth120,0 m
Total depth3 395,0 m MD
Vertical depth2 947,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table26,0 m
Formation at total depth-
RigScarabeo 6
Spud11.05.2003
Completed28.06.2003
OperatorTotal E&P Norge AS
Position59,6177 N, 2,4972 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
2 released wells in Skirne report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/5-C-1 AH same well | 0,0 | 4 146,0 | - | - | 2003 |
| 25/5-U-33 | 0,0 | - | - | - | - |
| 25/5-U-34 | 0,0 | - | - | - | - |
| 25/5-U-31 | 0,0 | - | - | - | - |
| 25/5-U-32 | 0,0 | - | - | - | - |
| 25/5-4 | 1,5 | 3 185,0 | 111 °C | 1,34 | 1990 |
| 25/5-H-2 AH | 3,5 | 3 948,0 | - | - | 2024 |
| 25/5-H-2 H | 3,5 | 2 840,0 | - | - | 2024 |
Casing and formation tests
No casing programme is reported for this wellbore.