WellplannerNorwegian shelf well data

Fields / Tyrving / 25/5-H-2 H

25/5-H-2 H

Development, observationPlugged

Drilled by Aker BP ASA with Deepsea Nordkapp in Tyrving, 30.03.2024 to 02.04.2024 (3 days), to 2 840,0 m.

Water depth120,0 m
Total depth2 840,0 m MD
Vertical depth2 317,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table32,6 m
Formation at total depth-
RigDeepsea Nordkapp
Spud30.03.2024
Completed02.04.2024
OperatorAker BP ASA
Position59,6282 N, 2,4385 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-

2 released wells in Tyrving report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
25/5-H-2 AH same well0,03 948,0--2024
25/5-H-1 AH0,02 885,0--2024
25/5-H-1 BY1H0,05 660,0--2024
25/5-H-1 BY2H0,05 984,0--2024
25/5-H-1 BY3H0,05 840,0--2024
25/5-H-1 H0,02 724,0--2024
25/5-92,62 265,083 °C1,352014
25/5-82,61 199,0-1,202013

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗