Fields / Tyrving / 25/5-H-1 BY3H
25/5-H-1 BY3H
Development, productionProducingOil
Drilled by Aker BP ASA with Deepsea Nordkapp in Tyrving, 29.02.2024 to 06.03.2024 (6 days), to 5 840,0 m.
Water depth120,0 m
Total depth5 840,0 m MD
Vertical depth2 213,5 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table32,6 m
Formation at total depth-
RigDeepsea Nordkapp
Spud29.02.2024
Completed06.03.2024
OperatorAker BP ASA
Position59,6280 N, 2,4382 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
2 released wells in Tyrving report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/5-H-1 AH same well | 0,0 | 2 885,0 | - | - | 2024 |
| 25/5-H-1 BY1H same well | 0,0 | 5 660,0 | - | - | 2024 |
| 25/5-H-1 BY2H same well | 0,0 | 5 984,0 | - | - | 2024 |
| 25/5-H-1 H same well | 0,0 | 2 724,0 | - | - | 2024 |
| 25/5-H-2 AH | 0,0 | 3 948,0 | - | - | 2024 |
| 25/5-H-2 H | 0,0 | 2 840,0 | - | - | 2024 |
| 25/5-9 | 2,6 | 2 265,0 | 83 °C | 1,35 | 2014 |
| 25/5-8 | 2,6 | 1 199,0 | - | 1,20 | 2013 |
Casing and formation tests