25/5-H-1 H
Development, observationPluggedOil
Drilled by Aker BP ASA with Deepsea Nordkapp in Tyrving, 19.01.2024 to 24.01.2024 (5 days), to 2 724,0 m.
Water depth119,0 m
Total depth2 724,0 m MD
Vertical depth2 347,7 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table32,6 m
Formation at total depth-
RigDeepsea Nordkapp
Spud19.01.2024
Completed24.01.2024
OperatorAker BP ASA
Position59,6280 N, 2,4382 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
2 released wells in Tyrving report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/5-H-1 AH same well | 0,0 | 2 885,0 | - | - | 2024 |
| 25/5-H-1 BY1H same well | 0,0 | 5 660,0 | - | - | 2024 |
| 25/5-H-1 BY2H same well | 0,0 | 5 984,0 | - | - | 2024 |
| 25/5-H-1 BY3H same well | 0,0 | 5 840,0 | - | - | 2024 |
| 25/5-H-2 AH | 0,0 | 3 948,0 | - | - | 2024 |
| 25/5-H-2 H | 0,0 | 2 840,0 | - | - | 2024 |
| 25/5-9 | 2,6 | 2 265,0 | 83 °C | 1,35 | 2014 |
| 25/5-8 | 2,6 | 1 199,0 | - | 1,20 | 2013 |
Casing and formation tests
No casing programme is reported for this wellbore.