Fields / Tyrving / 25/5-H-1 BY2H

25/5-H-1 BY2H

Development, productionProducingOil

Drilled by Aker BP ASA with Deepsea Nordkapp in Tyrving, 18.02.2024 to 27.02.2024 (9 days), to 5 984,0 m.

Water depth120,0 m
Total depth5 984,0 m MD
Vertical depth2 206,8 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table32,6 m
Formation at total depth-
RigDeepsea Nordkapp
Spud18.02.2024
Completed27.02.2024
OperatorAker BP ASA
Position59,6280 N, 2,4382 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-

2 released wells in Tyrving report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
25/5-H-1 AH same well0,02 885,0--2024
25/5-H-1 BY1H same well0,05 660,0--2024
25/5-H-1 BY3H same well0,05 840,0--2024
25/5-H-1 H same well0,02 724,0--2024
25/5-H-2 AH0,03 948,0--2024
25/5-H-2 H0,02 840,0--2024
25/5-92,62 265,083 °C1,352014
25/5-82,61 199,0-1,202013

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗