25/8-12 A
Exploration, appraisalPlugged and abandonedOil
Drilled by Esso Exploration and Production Norway A/S with Mærsk Jutlander in Balder, 09.06.1999 to 19.06.1999 (10 days), to 2 156,0 m in the Smith Bank Formation.
Water depth127,0 m
Total depth2 156,0 m MD
Vertical depth2 083,0 m TVD
Bottom-hole temperature85 °C
Max inclination24,9°
Rotary table23,0 m
Formation at total depthSmith Bank Formation
RigMærsk Jutlander
Spud09.06.1999
Completed19.06.1999
OperatorEsso Exploration and Production Norway A/S
Position59,2896 N, 2,4443 E
Formations
17 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 85 °C |
| Balder gradient | 33,9 °C/km |
| Estimated at total depth from the gradient | 70 °C |
The gradient is the median of 29 released wells in Balder with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/8-12 S same well | 0,0 | 2 096,0 | 82 °C | 1,33 | 1999 |
| 25/8-11 | 1,4 | 1 994,0 | 82 °C | 1,33 | 1997 |
| 25/11-U-40 | 2,5 | 149,0 | - | - | 1999 |
| 25/11-U-41 | 2,6 | 148,9 | - | - | 1999 |
| 25/11-U-42 | 2,6 | 149,8 | - | - | 1999 |
| 25/11-U-43 | 2,6 | 209,4 | - | - | 1999 |
| 25/11-U-6 | 2,6 | 150,4 | - | - | 1999 |
| 25/11-U-5 | 2,6 | 234,9 | - | - | 1999 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 211,0 | 36" | 213,0 | - |
| Intermediate | 9 5/8" | 990,0 | 12 1/4" | 990,0 | - |
| Open hole | - | 2 156,0 | 8 1/2" | 2 156,0 | 1,62 LOT |
Mud weight
4 measurements, one dot each, 1,30 to 1,33 g/cm³ against measured depth, oil (environ).