Fields / Ringhorne Øst / 25/8-15 S
25/8-15 S
Exploration, appraisalPlugged and abandonedOil
Drilled by Esso Exploration and Production Norway A/S with Ringhorne in Ringhorne Øst, 13.07.2004 to 07.08.2004 (25 days), to 4 804,0 m in the Statfjord Group.
Water depth128,0 m
Total depth4 804,0 m MD
Vertical depth2 038,0 m TVD
Bottom-hole temperature-
Max inclination83,2°
Rotary table60,0 m
Formation at total depthStatfjord Group
RigRinghorne
Spud13.07.2004
Completed07.08.2004
OperatorEsso Exploration and Production Norway A/S
Position59,2661 N, 2,4499 E
Formations
15 tops reported, measured depth in metres.
Temperature
| Reported at total depth | - |
1 released well in Ringhorne Øst report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/8-C-3 | 0,0 | 4 647,0 | - | - | 2006 |
| 25/8-C-3 A | 0,0 | - | - | - | - |
| 25/8-C-2 | 0,0 | 5 143,0 | - | - | 2005 |
| 25/8-C-2 A | 0,0 | 5 027,0 | - | - | 2024 |
| 25/8-C-19 | 0,0 | 6 680,0 | - | - | 2011 |
| 25/8-C-19 A | 0,0 | 7 651,0 | - | - | 2011 |
| 25/8-C-19 B | 0,0 | 6 815,0 | - | - | 2012 |
| 25/8-C-19 C | 0,0 | 4 578,0 | - | - | 2022 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 26" | 305,0 | 32" | 307,0 | - |
| Surface casing | 13 3/8" | 1 306,0 | 17 1/2" | 1 310,0 | 1,70 LOT |
| Open hole | - | 4 804,0 | 12 1/4" | 4 804,0 | - |
Mud weight
6 measurements, one dot each, 1,20 to 1,48 g/cm³ against measured depth, wbm.