Fields / Ringhorne Øst / 25/8-C-3
25/8-C-3
Development, productionProducingOil
Drilled by ExxonMobil Exploration and Production Norway AS with Ringhorne in Ringhorne Øst, 13.03.2006 to 04.04.2006 (22 days), to 4 647,0 m.
Water depth128,0 m
Total depth4 647,0 m MD
Vertical depth1 982,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table60,3 m
Formation at total depth-
RigRinghorne
Spud13.03.2006
Completed04.04.2006
OperatorExxonMobil Exploration and Production Norway AS
Position59,2661 N, 2,4499 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
1 released well in Ringhorne Øst report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/8-C-3 A same well | 0,0 | - | - | - | - |
| 25/8-15 S | 0,0 | 4 804,0 | - | 1,48 | 2004 |
| 25/8-C-2 | 0,0 | 5 143,0 | - | - | 2005 |
| 25/8-C-2 A | 0,0 | 5 027,0 | - | - | 2024 |
| 25/8-C-19 | 0,0 | 6 680,0 | - | - | 2011 |
| 25/8-C-19 A | 0,0 | 7 651,0 | - | - | 2011 |
| 25/8-C-19 B | 0,0 | 6 815,0 | - | - | 2012 |
| 25/8-C-19 C | 0,0 | 4 578,0 | - | - | 2022 |
Casing and formation tests
No casing programme is reported for this wellbore.