25/8-C-1 A
Development, productionPluggedOil
Drilled by ExxonMobil Exploration and Production Norway AS with Ringhorne in Balder, 30.09.2004 to 22.10.2004 (22 days), to 6 086,0 m.
Water depth128,0 m
Total depth6 086,0 m MD
Vertical depth1 949,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table60,3 m
Formation at total depth-
RigRinghorne
Spud30.09.2004
Completed22.10.2004
OperatorExxonMobil Exploration and Production Norway AS
Position59,2661 N, 2,4497 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Balder gradient | 33,9 °C/km |
| Estimated at total depth from the gradient | 64 °C |
The gradient is the median of 29 released wells in Balder with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/8-C-1 same well | 0,0 | 6 187,0 | - | - | 2004 |
| 25/8-C-1 B same well | 0,0 | 5 114,0 | - | - | 2025 |
| 25/8-C-17 | 0,0 | 5 428,0 | - | - | 2006 |
| 25/8-C-18 | 0,0 | 3 199,0 | - | - | 2003 |
| 25/8-C-18 A | 0,0 | 6 500,0 | - | - | 2003 |
| 25/8-C-18 B | 0,0 | 6 061,0 | - | - | 2005 |
| 25/8-C-4 | 0,0 | 4 310,0 | - | - | 2003 |
| 25/8-C-4 A | 0,0 | 5 470,0 | - | - | 2023 |
Casing and formation tests
No casing programme is reported for this wellbore.