25/8-C-4
Development, productionPluggedOil
Drilled by Esso Exploration and Production Norway A/S with Ringhorne in Balder, 14.02.2003 to 17.03.2003 (31 days), to 4 310,0 m.
Water depth128,5 m
Total depth4 310,0 m MD
Vertical depth1 961,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table60,3 m
Formation at total depth-
RigRinghorne
Spud14.02.2003
Completed17.03.2003
OperatorEsso Exploration and Production Norway A/S
Position59,2661 N, 2,4498 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Balder gradient | 33,9 °C/km |
| Estimated at total depth from the gradient | 64 °C |
The gradient is the median of 29 released wells in Balder with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/8-C-4 A same well | 0,0 | 5 470,0 | - | - | 2023 |
| 25/8-C-6 | 0,0 | 4 479,0 | - | - | 2002 |
| 25/8-C-5 | 0,0 | 5 133,0 | - | - | 2005 |
| 25/8-C-5 A | 0,0 | 5 191,0 | - | - | 2023 |
| 25/8-C-5 B | 0,0 | - | - | - | - |
| 25/8-C-18 | 0,0 | 3 199,0 | - | - | 2003 |
| 25/8-C-18 A | 0,0 | 6 500,0 | - | - | 2003 |
| 25/8-C-18 B | 0,0 | 6 061,0 | - | - | 2005 |
Casing and formation tests
No casing programme is reported for this wellbore.