25/8-C-6
Development, productionProducingOil
Drilled by Esso Exploration and Production Norway A/S with Ringhorne in Balder, 19.11.2002 to 20.01.2003 (62 days), to 4 479,0 m.
Water depth128,5 m
Total depth4 479,0 m MD
Vertical depth1 945,8 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table60,3 m
Formation at total depth-
RigRinghorne
Spud19.11.2002
Completed20.01.2003
OperatorEsso Exploration and Production Norway A/S
Position59,2661 N, 2,4498 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Balder gradient | 33,9 °C/km |
| Estimated at total depth from the gradient | 64 °C |
The gradient is the median of 29 released wells in Balder with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/8-C-4 | 0,0 | 4 310,0 | - | - | 2003 |
| 25/8-C-4 A | 0,0 | 5 470,0 | - | - | 2023 |
| 25/8-C-20 | 0,0 | 3 360,0 | - | - | 2003 |
| 25/8-C-7 | 0,0 | 3 901,0 | - | - | 2004 |
| 25/8-C-21 | 0,0 | 3 306,0 | - | - | 2004 |
| 25/8-C-21 A | 0,0 | 3 191,0 | - | - | 2020 |
| 25/8-C-21 B | 0,0 | 2 712,0 | - | - | 2025 |
| 25/8-C-5 | 0,0 | 5 133,0 | - | - | 2005 |
Casing and formation tests
No casing programme is reported for this wellbore.