25/8-C-21 A
Development, injectionPluggedCuttings
Drilled by Vår Energi AS with Ringhorne in Balder, 28.11.2020 to 07.12.2020 (9 days), to 3 191,0 m.
Water depth128,5 m
Total depth3 191,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table60,3 m
Formation at total depth-
RigRinghorne
Spud28.11.2020
Completed07.12.2020
OperatorVår Energi AS
Position59,2661 N, 2,4498 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Balder gradient | 33,9 °C/km |
| Estimated at total depth from the gradient | 106 °C |
The gradient is the median of 29 released wells in Balder with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/8-C-21 same well | 0,0 | 3 306,0 | - | - | 2004 |
| 25/8-C-21 B same well | 0,0 | 2 712,0 | - | - | 2025 |
| 25/8-C-15 | 0,0 | 1 372,0 | - | - | 2002 |
| 25/8-C-15 A | 0,0 | 3 191,0 | - | - | 2012 |
| 25/8-C-15 B | 0,0 | - | - | - | - |
| 25/8-C-10 | 0,0 | 5 105,0 | - | - | 2004 |
| 25/8-C-10 A | 0,0 | 5 277,0 | - | - | 2004 |
| 25/8-C-10 B | 0,0 | 5 502,0 | - | - | 2024 |
Casing and formation tests
No casing programme is reported for this wellbore.