WellplannerNorwegian shelf well data

Fields / Balder / 25/8-C-21

25/8-C-21

Development, injectionPluggedCuttings

Drilled by ExxonMobil Exploration and Production Norway AS with Ringhorne in Balder, 12.11.2004 to 28.11.2004 (16 days), to 3 306,0 m.

Water depth128,5 m
Total depth3 306,0 m MD
Vertical depth2 313,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table60,3 m
Formation at total depth-
RigRinghorne
Spud12.11.2004
Completed28.11.2004
OperatorExxonMobil Exploration and Production Norway AS
Position59,2661 N, 2,4498 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Balder gradient33,9 °C/km
Estimated at total depth from the gradient76 °C

The gradient is the median of 29 released wells in Balder with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
25/8-C-21 A same well0,03 191,0--2020
25/8-C-21 B same well0,02 712,0--2025
25/8-C-150,01 372,0--2002
25/8-C-15 A0,03 191,0--2012
25/8-C-15 B0,0----
25/8-C-100,05 105,0--2004
25/8-C-10 A0,05 277,0--2004
25/8-C-10 B0,05 502,0--2024

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗