WellplannerNorwegian shelf well data

Fields / 25/8-U-17

25/8-U-17

Other, unknownPlugged and abandoned

Drilled by Esso Exploration and Production Norway A/S with Bucentaur, 04.07.1997 to 04.07.1997 (0 days), to 146,0 m.

Water depth128,0 m
Total depth146,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table3,0 m
Formation at total depth-
RigBucentaur
Spud04.07.1997
Completed04.07.1997
OperatorEsso Exploration and Production Norway A/S
Position59,4566 N, 2,3843 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-

The wellbore is not in a field, so no field gradient applies.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
25/8-U-130,2141,8--1996
25/8-U-150,2159,2--1997
25/8-U-160,2159,4--1997
25/8-U-120,4134,3--1996
25/8-U-110,4134,6--1996
25/8-U-90,8134,9--1996
25/8-U-100,8134,7--1996
25/8-5 S1,13 395,092 °C1,501994

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗