Fields / 25/8-U-19
25/8-U-19
Other, unknownPlugged and abandoned
Drilled by Esso Exploration and Production Norway A/S with Bucentaur, 04.07.1997 to 04.07.1997 (0 days), to 174,2 m.
Water depth127,2 m
Total depth174,2 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table3,0 m
Formation at total depth-
RigBucentaur
Spud04.07.1997
Completed04.07.1997
OperatorEsso Exploration and Production Norway A/S
Position59,4431 N, 2,3899 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.