Fields / 3/7-5
3/7-5
Exploration, wildcatPlugged and abandonedShows
Drilled by A/S Norske Shell with Dyvi Stena, 06.12.1991 to 07.02.1992 (63 days), to 3 666,0 m in the Zechstein Group.
Water depth67,0 m
Total depth3 666,0 m MD
Vertical depth-
Bottom-hole temperature126 °C
Max inclination20,9°
Rotary table25,0 m
Formation at total depthZechstein Group
RigDyvi Stena
Spud06.12.1991
Completed07.02.1992
OperatorA/S Norske Shell
Position56,4797 N, 4,3049 E
Formations
21 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 126 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 3/7-6 | 5,5 | 4 120,0 | 130 °C | - | 1996 |
| 3/8-U-2 | 7,5 | 109,2 | - | - | 2009 |
| 3/8-U-3 | 7,5 | 109,3 | - | - | 2009 |
| 3/8-U-1 | 7,5 | 108,6 | - | - | 2009 |
| 3/8-1 | 7,5 | 4 070,0 | - | 1,64 | 2010 |
| 3/7-7 | 8,5 | 3 930,0 | 127 °C | 1,62 | 2008 |
| 3/7-U-7 | 8,5 | 108,0 | - | - | 2007 |
| 3/5-2 | 8,6 | 3 825,0 | 110 °C | 1,54 | 1978 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 153,0 | 36" | 155,0 | - |
| Intermediate | 20" | 601,0 | 26" | 615,0 | 1,49 LOT |
| Intermediate | 13 3/8" | 1 716,0 | 17 1/2" | 1 730,0 | 1,84 LOT |
| Intermediate | 9 5/8" | 3 075,0 | 12 1/4" | 3 090,0 | 1,96 LOT |
Mud weight
17 measurements, one dot each, 1,00 to 1,60 g/cm³ against measured depth, water based.