Fields / 3/8-U-1
3/8-U-1
Other, soil drillingPlugged and abandoned
Drilled by Lundin Norway AS with Bucentaur, 22.09.2009 to 23.09.2009 (1 days), to 108,6 m.
Water depth65,3 m
Total depth108,6 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table3,0 m
Formation at total depth-
RigBucentaur
Spud22.09.2009
Completed23.09.2009
OperatorLundin Norway AS
Position56,4544 N, 4,4184 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.