30/11-V-6 H
Development, injectionOnlineWater
Drilled by Aker BP ASA with Deepsea Stavanger in Munin, from 15.06.2026.
Water depth106,0 m
Total depth-
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table30,0 m
Formation at total depth-
RigDeepsea Stavanger
Spud15.06.2026
Completed-
OperatorAker BP ASA
Position60,1112 N, 2,5926 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Munin gradient | 36,0 °C/km |
The gradient is the median of 12 released wells in Munin with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/11-V-4 H | 0,0 | 3 647,0 | - | - | 2025 |
| 30/11-V-2 H | 0,0 | - | - | - | 2025 |
| 30/11-V-3 H | 0,0 | 6 148,0 | - | - | 2025 |
| 30/11-W-1 H | 0,1 | 6 320,0 | - | - | 2026 |
| 30/11-W-2 AH | 0,1 | - | - | - | 2026 |
| 30/11-W-2 BH | 0,1 | - | - | - | - |
| 30/11-W-2 H | 0,1 | 7 352,0 | - | - | 2025 |
| 30/11-W-3 AH | 0,1 | 4 630,0 | - | - | 2026 |
Casing and formation tests
No casing programme is reported for this wellbore.