Fields / Martin Linge / 30/4-A-12
30/4-A-12
Development, productionClosedGas
Drilled by Total E&P Norge AS with Maersk Intrepid in Martin Linge, 30.03.2017 to 26.06.2017 (88 days), to 4 980,0 m.
Water depth115,0 m
Total depth4 980,0 m MD
Vertical depth3 888,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table57,0 m
Formation at total depth-
RigMaersk Intrepid
Spud30.03.2017
Completed26.06.2017
OperatorTotal E&P Norge AS
Position60,5062 N, 2,0148 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Martin Linge gradient | 31,3 °C/km |
| Estimated at total depth from the gradient | 120 °C |
The gradient is the median of 7 released wells in Martin Linge with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/4-A-5 Y1 | 0,0 | 4 328,0 | - | - | 2025 |
| 30/4-A-5 Y2 | 0,0 | 4 594,0 | - | - | 2025 |
| 30/4-A-5 Y3 | 0,0 | 4 163,0 | - | - | 2025 |
| 30/4-A-11 | 0,0 | 4 800,0 | - | - | 2021 |
| 30/4-A-19 | 0,0 | 5 276,0 | - | - | 2018 |
| 30/4-A-13 | 0,0 | 4 718,0 | - | - | 2018 |
| 30/4-A-13 A | 0,0 | 4 812,0 | - | - | 2025 |
| 30/4-A-18 | 0,0 | - | - | - | 2026 |
Casing and formation tests
No casing programme is reported for this wellbore.